Project overheads
The Code of Estimating Practice, seventh edition, published by the Chartered Institute of Building (CIOB) in 2009 suggests that project overheads (sometimes referred to as site overheads, preliminaries, general cost items or expenses) are:
| The cost of those site-specific project costs that cannot allocated to individual activities and which are not included in all-in or composite rates. Among other things, these costs may include site management, huts, safety precautions, job-related insurances, bonding costs, telephone, water, electricity costs, etc. The essential characteristic is that these overheads serve more than one activity, e.g. tower crane, skips, general site labour, etc. However, in practice some resources that could be allocated to an activity, e.g. scaffolding for falsework, are included in the preliminaries because of the contractor’s preferred method of pricing. |
See also: Preliminaries.
--CIOB
[edit] Related articles on Designing Buildings Wiki
- Attendance.
- Bills of quantities.
- Chartered Institute of Building.
- Code of Estimating Practice.
- Contract sum.
- Cost consultant.
- Cost control.
- Cost plans for construction projects.
- How to calculate head office overheads and profit.
- Mark-up.
- Method statements.
- New Rules of Measurement.
- Overheads.
- Pre-construction information.
- Preliminaries.
- Prime cost contract.
- Profit and overheads on construction projects
- Provisional sums.
- Standard Method of Measurement.
- Tender documents.
- Tender.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Sir Edwin Lutyens: Britain's greatest architect? Book review.
CIOB publishes free template to help assess and manage risks.
ECA's reflections on Party Conference season
Burnham wants to be confident of winning before asking for a fresh mandate.
New Chief Construction and Scientific Adviser
Sergio Cavalaro, Professor of Infrastructure Systems at Loughborough University.
Building safety levy for England
CIAT publish estimator tool for members.
Water sector faces a growing crisis that could slow the delivery of vital infrastructure.
Undervaluing our industrial past
Heritage value changes as taste for building styles changes.
Changing expectations around competence and compliance
New information sheet from CIAT.
Grenfell investigation files passed to CPS
Angela Rayner apologises on behalf of the British state.
Electrical contractors need to understand the practical implications.
The real barrier to getting more value from digital technology.
Your guide to The Construction Reset at UKCW Birmingham.